Wednesday, November 23, 2011

A little bit more progress.....

And again, we've had more requests for an update! I am so pleased that there are people out there reading this and it's not just us! :)

Since the last update:

The front door frame has been changed


The bath surround (?hob) has been installed.  The bath won't go in until a lot later to avoid being damaged.  Building Inspector #1 checking it out

Extra noggins have been put in.  Here they are in the family bathroom for the toilet roll holder!

Our cavity slider frames have been installed - this is the one into the ensuite

We shifted the remaining bricks (515!) out of the way so we can use them later for....well, we're not too sure exactly, but maybe letterbox, pizza oven??

We are really looking forward to see what happens next! :)

Thursday, November 17, 2011

So what's been happening?? - we hear you ask!


So for those of you who have asked....(and there has been at least 2 of you!!), here is an update!

Since we last posted we have had:

- the bricks finished
- the sparkies have done their thing - first fix
- a new front door frame has been delivered
- some extra noggins have been put in place
- done a walkthrough to check the positioning of the electrics
- the sparkies have been back in to amend a few things we spotted
- some plaster has been delivered

and here are some photos........

Window Sills along the south wall

Garage wall

Good to see there is some sense of humour within the house! :)

Master bedroom window out to the alfresco

Kitchen window out to the Alfresco
Some extra noggins have been put in - thanks Dan!  Here they are in the lounge up high for future TV or mirror...


The conduit in the kitchen for power to get to the island bench

Fully bricked

The front porch with the front pillar bricked

Our new front door frame

View from the driveway without all the brickies bits & pieces

The front door - still to be changed


Building Inspectors #1 & #2 inspecting the delivery of plaster

The conduit in the kitchen - no moving it now!


Next steps:
Plaster to go up.
Lock up should be soon I guess????  Stay tuned!! :)

Monday, November 7, 2011

A surprise find......

We had a chance to go and visit the house 'child free' on Sunday afternoon to check out a few things and were pleasantly surprised to find some work had been done since our visit on Friday evening.

There were some more bricks and the sills had been done on a few rooms:

Bathroom and toilet windows - complete with their sills

The front porch - all completed apart from the front door which needs to be changed.

The windows for the study and the ensuite

Master bedroom window

Bricking on the walls almost there....

Friday, November 4, 2011

Quite a quiet week

A combination of rain and horseracing has meant a slow week - that and the fact that building brick walls is slower than putting up wooden frames.
Lake Midgley is back - didn't wash away the dunny though.
Someone has been planing down the internal frame in preparation for the plasterboard


Building inspector No. 2 on his way to a tea break



the central heating has arrived, just in time for a 30°C weekend
New brickwork and old (1 week old) brickwork, proudly sponsored by Coca Cola

From the Al Fresco to the Master Bedroom, with the lounge on the right.

Wednesday, October 26, 2011

It's a wrap!

Wednesday 26th October's progress:

The house is wrapped (& so are we!)
More bricks
Hot water pipes

Amazing to think we had a plain block of land only 5 weeks ago!

and here's some pictures:

Our wrapped house!

From the driveway

A closer look at the front - with some brickwork at the garage to be seen.

Knew he would have fun getting over the sand

Garage wall

Down the side of the garage wall with the meter box in place

Brickwork down the south side of the house

Inside our house!!   Looking from the kitchen ....all the way......through to the rumpus.

One of the articulation joints

Pipework for the HWS

Building inspector #1 inspecting the brickwork outside the laundry

Garage wall

Tuesday, October 25, 2011

25th October - has Christmas come 2 months early???

It does seem like Christmas has come early.....as we now have a Roof, Blue Paper, Bricks, Water & Gas!!


9.55am - 25th October 2011


9.55am - Looking down the driveway

12pm - Looking down the driveway with roofing taking place

On closer inspection - we notice the brickies are on site - & we have some blue paper in the distance!


Just after 5pm - most of the colorbond is on & the roofing guys were still on site!

6.15pm - looking good!

Making our way over the pile of sand that is in the middle of the driveway. How much fun would the boys have in that??


W wanted to know why there was a cement mixer on site! I was very excited to tell him that it was because we were getting bricks laid!


On our inspection inside we see the plumbing has been done.  This is the laundry

Pipes

Water pipes (the black ones) and the soil pipe/stack thingy (the white one)


Kitchen - plumbing



Water pipe for the fridge.  The yellow pipe above is the gas pipe heading over to the hot plates




Tap outside the laundry

Outside tap just outside the ensuite - with running water

Bricks!!!!!  (Selkirk Indigo in case you were wondering!)

From the south west corner looking back towards the garage and along the south wall. 

It looks like they are wrapping the house as they go.

A wrapped wall and a lovely looking brick wall.

Really pleased with the colour of the bricks - can't wait til the mortar has dried and the bricks have been cleaned to see the finished result.

Our jagged roofline

Blue paper along the garage


Colorbond Jigsaw pieces. I do feel sorry for our roofing guys - it's not the easiest of roofs!


Bed 4 - all wrapped and very much a 'room'! I had to use the flash as I was indoors!!!

W's room

J's room



More of the Colorbond Roof Jigsaw puzzle